Service, calibration and qualification of BINDER equipment
We have been an authorised BINDER service centre since 1997. We repair units under warranty and after it expires, calibrate them, measure temperature and humidity distribution according to DIN 12880 and perform IQ/OQ qualification. After measurements and qualifications, we provide a certificate or documentation.
Service and calibration
+48 602 538 451+48 602 243 95024h/7
- For your request
- model, serial number and fault description
- Warranty
- repairs under warranty and after it expires
authorised service since 1997
Scope of services
Everything a BINDER unit needs after purchase – from repairs to audit documentation.
Warranty and post-warranty service
We repair and service BINDER units under warranty and after it expires, as the manufacturer’s authorised service partner.
Calibration and adjustment
We check how far the unit’s readings deviate from the value measured with a reference instrument. If necessary, we adjust the unit, i.e. set it so as to eliminate this deviation. We calibrate all BINDER units and confirm the result with a certificate.
Temperature and humidity distribution (mapping)
We measure temperature and humidity distribution in the working space according to DIN 12880, at 1, 9 or 27 points, using instruments calibrated by the Polish Central Office of Measures (GUM). In chambers with lighting, we also measure light distribution. We confirm the result with a certificate.
IQ/OQ qualification
We perform installation and operational qualification with validation documentation.
Performance test
We check how long the unit takes to reach the set parameters, e.g. how long it takes to heat up or cool down to a selected temperature.
Monitoring systems
We design and install monitoring systems: for BINDER chambers using APT-COM™ software, and for other equipment and air-conditioned rooms – independent systems.
How to request service
Before you send your request, prepare some information about the unit.
Check the model and serial number
You will find both on the unit’s rating plate. Enter the model in the “Unit or model” field, e.g. KBF 720, and the serial number in the message.
Describe the fault
Tell us what is happening, since when and at what settings. If the controller shows a message or alarm, copy its text.
Send your request
Select the subject “Service or repair” in the form or call our service team. You will find the phone numbers in the Contact section.
We will reply
We will contact you by email or phone and agree on the next steps.
Temperature and humidity distribution according to DIN 12880
Mapping shows how temperature and humidity are distributed in the unit’s working space. We match the number of measuring points – 1, 9 or 27 – to your procedures.
- 1, 9 or 27
- measuring points, according to your procedures
- GUM
- measuring instruments calibrated by the Polish Central Office of Measures (GUM)
- °C, %rh, lx
- temperature, humidity and, in chambers with lighting, also light
Mapping report
After calibration and mapping, we provide a certificate with the measurement results. The sample mapping report shows what it contains.
What you receive after the measurements
- Results from each measuring point: 1, 9 or 27 points according to DIN 12880
- Measurements with equipment calibrated by GUM (Polish Central Office of Measures)
- Conclusion and confirmation that the measurements were performed
IQ/OQ qualification
Laboratories and facilities working to GMP or GLP must document that a unit is correctly installed and operates in accordance with its specification. Qualification is usually performed after installation, before the unit is released for use. After qualification, we provide validation documentation.
- Installationthe unit is in place
- IQinstallation qualification
- OQoperational qualification
- Releasethe unit can be put into operation
IQ – installation qualification
Confirms that the unit has been installed correctly and that all components and documents are complete. Its result serves as the reference point for subsequent validations.
OQ – operational qualification
Confirms that the unit operates in accordance with its specification and achieves the stated parameters. Tests are carried out in an empty chamber, without load.
Monitoring systems
We record and document the operation of BINDER chambers as well as other equipment and rooms.
BINDER chambers: APT-COM™ 4
APT-COM™ 4 is BINDER software for recording, managing and documenting chamber operation. We use it as the basis for designing and installing monitoring systems for BINDER chambers.
Recording and documentation of measured values, and chamber programming in a graphical interface.
BASIC
up to 5 units
Supplied with the KB PRO, KBF, KBF PRO, MK, MKF, MKT, MKFT, MK CO2 and MKF CO2 series.
PROFESSIONAL
up to 100 units
Overview of units on a room layout.
GLP
PROFESSIONAL + GLP
Tamper-proof documentation compliant with GLP/GMP guidelines and FDA 21 CFR 11 requirements.
Order calibration, mapping or qualification
Tell us which units we should check, under what conditions they operate (temperature, humidity) and how many measuring points your procedure requires. Please also give the planned date.
Contact
Sales office and service
SIMA
ul. Pokrzywnicka 3a
04-320 Warszawa
- Opening hours
- 24h/7
Write to us
Choose a topic and describe what you need. We will reply by email or phone.
The data controller is „SIMA” s.c. P. Sikora, M. Gniadzik, ul. Pokrzywnicka 3a, 04-320 Warszawa. We will use the data from the form to reply to your message. More in our privacy policy.









